ACCEPTANCE TEST OF 174 MWP PPA PROJECT

meteocontrol supported MEAG, a Munich Re company, in the acceptance procedure of the Don Rodrigo PV project in Spain. In doing so meteocontrol carried out various processes for the acceptance - from visual inspection of the components to the testing of the medium-voltage cables. The 174 MWp plant which is located near Sevilla and is the first large-scale Power Purchase Agreement (PPA) project in Europe.

 

System data


Location: Spain                  

Completion: 2018                

Size: 174 MWp                                                  

Services


  • Visual inspection (100%) of the installed components e.g. modules, inverters, substructure
  • Inspection of Civil Works
  • Inspection of torques
  • Thermographic inspection of modules and terminal connections
  • Meggering of medium-voltage cables

 Image source: meteocontrol GmbH

 

back to overview