Rating of PV Systems

The audit for independent evaluation of PV power plants in accordance with international rating standards

The rating procedure is oriented towards the DIN EN ISO / IEC 17020 and certifies a system’s quality and contingency tisk. It assesses these factors with a rating of AAA through C, as commonly used in the banking sector. The independent assessment allows for an objective comparison of different PV projects and better positioning within the market.

Your benefits

  • Better financing conditions due to reliable rating
  • Strong sales argument when selling the system or subsystems of the park
  • Risk mitigation through meaningful system evaluation based on standard international rating procedures

Services

Project planning evaluation
  • Technical concept and selection of technical components
  • General contractor / planner
  • Documentation and QA concept
  • Commercial and legal concept
EPC contract check
  • Technical criteria
  • QA concept
  • Financial aspects
  • Framework conditions and addenda
Construction phase evaluation
  • Technical concept and selection of technical components
  • Documentation and QA concept
  • Operational management concept
O&M contract
  • Definition of services
  • Guarantees for yields and in-feed availability, liability regulation
  • Definition of costs and price adjustment details
  • Framework conditions and addenda
Operational phase
  • Remote monitoring concept
  • Documentation and QA concept
  • Operational management concept

Your contacts

Dipl.-Ing. Univ. Matthias Hadamscheck
Head of Technical Consulting
Phone: +49 821 34 666 74
E-mail: m.hadamscheck@meteocontrol.de

 

Christopher Meyer-Friedrich
Sales Engineer
Phone: +49 821 34 666 67
E-mail: c.meyer-friedrich@meteocontrol.de