POWER PLANT CONTROLLER FOR SOLAR PARK MIDDEN-GRONINGEN

meteocontrol implemented the plant control with the Power Plant Controller (PPC) and project-specific Grid Code Compliance Services for the largest solar park in the Netherlands. In close cooperation with the partners Astronergy as project developer and Goldbeck Solar as EPC company, the 103 MWp PV power plant was reliably integrated into the grid area of TenneT.

 

System data


Location: Netherlands                  

Completion: 2019                

Size: 103 MWp                                                 

Services


  • Power Plant Controller (PPC) based on the controller blue’Log XC
  • Highest grid connection requirements (RfG generator type D)
  • Active power control, Reactive power / power factor and voltage control
  • Simulation models (DIgSILENT PowerFactory, PSS/E)
  • Grid Code Compliance (GCC) / Site Acceptance Testing (SAT)
  • Monitoring based on data logger blue’Log XM
  • Project management and commissioning

 Image source: Goldbeck Solar

 

back to overview